Post-Construction Cleaning in Geneva
Dust and debris removal after construction work. Local experts based near Geneva.
Why choose HopMove for your post-construction cleaning in Geneva?
Tailored service meeting strict Swiss real estate standards. Rapid response in Geneva.
100% Guarantee
Agency handover secured or we return for free.
Local Team
Rapid intervention in your neighbourhood.
Eco Products
Certified environmentally friendly.
What makes post-construction cleaning different from ordinary cleaning?
The difference is not intensity but the nature of the soiling. Maintenance cleaning removes dust and marks of use: they sit on the surface and yield to a household product. A building site leaves residues that have hardened while bonding to the substrate — cement haze, plaster film, paint splashes, tile adhesive, silicone, protective tape residue. They are not wiped off, they are released.
That changes the method entirely. On cement haze, rinsing with clean water simply redistributes it as it dries: you need an acidic descaler diluted according to the substrate, a controlled dwell time, then neutralisation — otherwise the product keeps working and marks the floor. On freshly laid parquet, water is the principal enemy. On natural stone, the wrong acid etches the surface irreversibly.
So an intervention is prepared by identifying the substrates before bringing products, rather than arriving with a standard trolley. The skill that matters here is not speed but diagnosis: telling polished concrete from quartz-finished concrete, knowing that rectified tiling with narrow joints is treated differently from ordinary porcelain.
Why can the price not be quoted per square metre?
Because floor area is not what determines the workload. Two flats of identical size can take one day or three depending on what has been left on the floors and surfaces. The decisive factor is the nature and thickness of the residue, then the condition of the glazing, then the presence of delicate surfaces requiring a dedicated treatment.
A concrete example: a 90 m² unit whose floors were protected during the works, with only a fine plaster dust remaining, is handled in one day with two people. The same unit, if cement haze has dried on the tiling without being rinsed in the hours after grouting, needs a full descaling programme and can occupy the same team for three days.
Quoting per square metre would therefore mean calibrating the rate on the hardest case. Clean sites would pay a safety margin that has nothing to do with them, and difficult sites would see the figure revised upwards on the day. We prefer to look, then quote, then commit to a fixed figure.
What needs removing before we arrive?
The boundary between waste removal and cleaning is the first source of misunderstanding on a site, and it is better settled in writing on the quote. Rubble, offcuts, packaging, pallets and floor protection are removal. They can be included in our intervention, but they are priced by volume rather than by area, like a clearance.
What is strictly cleaning begins once the volume is out: residues bonded to the substrates, the fine dust that has settled everywhere including in trunking and on frames, protective tapes and their adhesive traces, labels on sanitary ware and glazing.
In practice the most efficient arrangement is to have removal and cleaning done by the same team, in sequence. Getting the volume out frees the surfaces, and cleaning immediately afterwards prevents a fresh layer of dust settling on floors already treated — which happens without exception when two contractors work two days apart.
How is cement haze treated?
Cement haze is the most common residue and the most frequently mishandled. It is a mineral film left by gauging water rising to the surface of the joints, whitening the tiling and resisting every household product. The temptation is to scrub harder; the solution is chemical, not mechanical.
The protocol has four stages and none can be shortened. First a test on an inconspicuous witness area, to check how the substrate and the grout react. Then application of a descaler diluted according to the porosity of the material, with a monitored dwell time — too short and it does not work, too long and it attacks the joints. Then gentle mechanical work, a rotary machine with a suitable pad, never an abrasive that would scratch polished porcelain. Finally neutralisation and a full rinse, without which the acidic residue stays active and leaves a matt film.
On natural stone, marble or travertine the protocol changes completely: common acids are excluded and a specific, slower treatment is required. This is precisely the kind of detail that makes an apparently identical site cost twice as much, and why a quote given over the telephone is an approximation.
Glazing and joinery after building work
This is the most visible item at handover and the one that triggers the most reservations, because it is examined standing up, against the light, without bending. Three problems accumulate there: protective films and their adhesive residue, splashes of plaster, paint or mortar, and micro-traces of cement bonded to the glass.
Films left too long on glazing exposed to the sun are the most delicate case: the adhesive polymerises and the film tears away in patches leaving hardened glue. Removal then needs a solvent compatible with the seals and the frame, followed by careful blade work — never dry-scraping glass carrying mineral grit, which is how a double-glazed unit gets permanently scratched.
The joinery matters as much as the glass. Rebates, drainage channels, sliding-door grooves and patio-door tracks accumulate a construction dust which, once damp, turns to paste and jams the mechanisms. A slider that binds at handover is almost always an uncleaned track rather than an installation fault.
How long before handover should we clean?
Post-construction cleaning belongs after the last trade, and as close to handover as possible. The reason is mechanical: every subsequent intervention, even a one-hour paint touch-up or adjusting a door, puts dust back into suspension and it settles on the treated surfaces.
In Geneva practice the difficulty is not the sequence but programme slippage. A handover rarely moves by three weeks; it moves by two days, usually in the direction that reduces your margin. That is why we work seven days a week on this type of job: a site handed over on a Monday morning is cleaned on the Sunday, and a forty-eight-hour shift should not cost you the delivery date.
So the useful schedule is: book as soon as the handover date is known even if provisional, confirm the slot once the last trade has a firm date, and plan a short touch-up on the morning of handover for marks that have appeared in between. That last step is frequently skipped and it is what separates a site accepted from a site accepted with reservations.
Rough clean or handover clean?
It is worth distinguishing two services that the phrase "post-construction cleaning" covers indiscriminately, because they have neither the same purpose nor the same cost.
The rough clean happens during the works, between trades. It clears the bulk residue, opens the circulation routes and makes surfaces workable for the next trade. It is not intended to produce a finished result: its job is to stop the tiler working on a floor strewn with plasterboard offcuts. It is often ordered once or twice on a site running several weeks.
The handover clean is the finishing service: it targets the condition in which the client takes possession. Everything counts there, including what will not get dirty again — the inside of cupboards, the tops of frames, ventilation grilles, labels on sanitary ware. Confusing the two leads to underestimating the budget: a well-executed rough clean does not remove the need for the second, it only makes it faster.
Which premises and which types of site do you handle?
The protocols differ noticeably with the intended use of the space, and the quote reflects that. On a new or renovated dwelling, attention goes to floors and glazing, and the finish has to be impeccable because the occupier moves in immediately. On offices, the main constraint is cabling and raised floors: fine dust lodges in trunking and reappears over the following weeks if it is not extracted with suitable equipment.
On retail space the question becomes the opening date: cleaning slots in between the fit-out and stocking the shelves, often in a night-time window. On technical or industrial premises, heavy residues and access govern the job, sometimes with site-specific safety requirements.
We also work on partial sites, which represent a substantial share of demand in Geneva: a bathroom redone in an occupied flat, a kitchen replaced, a wall taken out. The work there is different because the existing finishes have to be protected and the dust contained rather than a bare volume treated, and because the occupier is living on site throughout.
How do you check a post-construction cleaning quote?
An honest quote names the items; an approximate one announces a lump sum and recovers the difference in extras. Five points should appear in writing, and their absence is more telling than the figure at the bottom of the page.
First the exact scope: which rooms, which levels, annexes included or not. Then the floor treatment, with the type of residue expected and the protocol chosen, because that is where the cost differential sits. Then the glazing, stating whether the exterior and film removal are included, and whether height access is needed. Then waste removal: included, excluded, or priced separately by volume. Finally what happens if the handover is postponed, and what happens if a cleanliness reservation is raised.
On that last point our commitment is simple and deliberately limited to what depends on us: a handover check is carried out with you before we leave, and any cleanliness item within our scope raised at handover is put right at no charge. We do not promise acceptance of the site, which also depends on installation, finishes and adjustments — that is, on other trades' work.
What changes on a Geneva site
Substrates diagnosed before products
Floors are identified before work and a test is run on a witness area. The wrong acid on natural stone produces irreversible damage costing more than the entire clean.
Seven days a week
Handovers move by forty-eight hours, rarely by three weeks. Working weekends is what absorbs the slippage without shifting the delivery date.
Removal and cleaning by one team
Getting the volume out then cleaning in sequence prevents a fresh dust layer settling on floors already treated — which happens whenever two contractors work two days apart.
Handover check done with you
The walk-round happens together before we leave. Anything raised then is put right on site, which is better than a reservation recorded on the acceptance report.
Fixed quote after a site visit
The site is seen before it is priced, and the figure does not move afterwards even if the job runs longer. A quote given over the telephone cannot offer that.
Team covered by professional liability
On a new-build site the risk is not theoretical: scratched glazing or a marked parquet is repaired at replacement cost. Cover and company registration number appear on the quote.
Your local post-construction cleaning expert in Geneva
Based in the Geneva region, we work daily in Geneva and know the local specifics: building types, agency requirements and access constraints. This field experience lets us deliver a reliable, consistent post-construction cleaning that meets Swiss standards.
Every job is carried out by a fixed, trained team with professional liability insurance. We use certified products and professional equipment, with systematic quality control and transparent billing — a fixed quote, no surprises.
- Local, trained and insured team
- Certified products & professional equipment
- Fixed quote, satisfaction guaranteed
- Fast response in Geneva and nearby
How an intervention runs
- 01
Site visit and substrate survey
We attend the site to record surfaces, the nature of the residues and access constraints. That visit is what makes a fixed quote possible: without it any figure is an estimate.
- 02
Fixed quote and slot booking
The quote names the items, states what is included and what is extra, and sets out the protocol chosen for the floors. The slot is placed against the handover date, weekends included.
- 03
Witness-area test
Before any chemical treatment, a trial on an inconspicuous surface checks how the substrate and joints react. Fifteen minutes that prevent irreversible damage.
- 04
Removal, then floor treatment
The volume goes out, then floors are treated to the chosen protocol: descaling, gentle mechanical work, neutralisation and rinse. Work runs top down so nothing is resoiled.
- 05
Finishes, glazing and joinery
Glazing, rebates, tracks, sanitary ware, kitchen, cupboards, grilles and electrical fittings. The longest phase in hours and the most decisive at handover.
- 06
Handover check and touch-up
We walk the site with you. Anything raised is put right on the spot. If a cleanliness reservation within our scope still appears at handover, we return at no charge.
What the handover clean covers
- Removal of floor protection, tapes and site films, including adhesive residue.
- Descaling of cement haze on tiling, with prior witness-area test, monitored dwell time and full neutralisation.
- Treatment matched to sensitive floors: parquet, natural stone, marble, polished concrete, resin, linoleum.
- Removal of plaster, paint, tile adhesive and silicone splashes from all substrates.
- Glazing inside and out where reachable without a cherry picker, films and labels included.
- Rebates, drainage channels, sliding-door grooves and patio-door tracks cleared.
- Joinery, frames, architraves, skirting boards and thresholds.
- Sanitary ware: label removal, commissioning descale, taps and seals.
- New kitchen: inside and outside of units, worktops, oven, hood, hobs.
- Inside of cupboards, tops of wardrobes and shelving.
- Ventilation grilles, extract vents and convectors.
- Switches, sockets, light fittings and finishing plates.
- Radiators, including behind and between the elements.
- Stairs, landings, lift and common circulation used during the works.
- Balconies, terraces, balustrades and drainage outlets.
- Cellars, technical rooms and annexes where the scope includes them.
- Removal of rubble, offcuts and packaging on request, priced by volume.
Why a post-construction clean takes three passes
| Pass | Objective | What is done | Why it cannot be skipped |
|---|---|---|---|
| 1. Heavy clean | Remove and rough out | Remaining waste and rubble taken out, industrial vacuuming, heavy soiling lifted | Fine cleaning before the heavy dust is gone achieves nothing |
| 2. Technical clean | Treat construction residues | Cement film, paint spots, adhesive, silicone, tape, labels, protective film | Each residue needs its own product: this is the pass that decides the result |
| 3. Finish after settling | Recover redeposited dust | 24 to 48 h later: fine airborne dust has settled onto every surface | Without it, the client sees a film of dust on handover day |
The third pass is the one cheaper quotes drop, and it is exactly the one that shows. Plaster and cutting dust stays airborne for hours: it settles after the teams have left, onto worktops, sills and glazing.
Every construction residue has its treatment
| Residue | Treatment | What to avoid | Surface at risk |
|---|---|---|---|
| Cement film | Diluted acidic detergent, dwell time, generous rinse | Dry scraping, undiluted acid | Natural stone and glazed tile: acid dulls the surface |
| Acrylic paint spots | Softening with hot water then gentle mechanical removal | Strong solvent on plastic or PVC | PVC frames, sealant, remaining protective film |
| Oil-based paint or varnish | Suitable solvent, applied locally | Solvent on filmed glazing or composite | Treated glazing, laminate worktops |
| Silicone and mastic | Plastic blade then specific dissolver | Metal blade on glazing or stainless steel | Glass, brushed stainless, sanitaryware enamel |
| Adhesive residue and labels | Adhesive remover, dwell time, wipe off | Dry scraper on painted surfaces | Painted doors, brand-new appliances |
| Plaster dust | Fine-filtration vacuuming before any wetting | Broom or mop straight away | All surfaces: once wet, dust becomes sticky slurry |
| Masking tape marks | Gradual peeling, dissolver if residue remains | Fast pulling on fresh paint | Paint less than seven days old: it comes away with the tape |
Two rules we do not negotiate. Dust is vacuumed BEFORE it is wetted, otherwise it turns into slurry that works into the joints. And on paint less than a week old, no adhesive is pulled off abruptly: the paint has not finished curing and it lifts with the tape.
Custom quote — why there is no fixed rate — Post-Construction Cleaning in Geneva
On a post-construction site, the work is not defined by floor area but by what is left on the surfaces. Two flats of identical size take one day or three depending on whether you are dealing with plaster dust or hardened cement laitance. A per-m² rate quoted without a site visit is either a safety margin you pay for nothing, or a price revised upwards on the day.
What determines the price
- Type of residue: plaster dust, cement laitance, paint splashes, silicone, adhesives and labels
- Total floor area and number of levels involved
- Condition of glazing and frames: protective film, mastic marks, splashes
- Porous floors (polished concrete, natural stone, untreated parquet) requiring dedicated treatment
- Whether rubble, packaging and offcuts need removing
- Site access: floor level, lift availability, unloading space
- Deadline: handover within 24–48 h or a flexible schedule
Free, fixed quote within 2 h of a site visit or photos. The amount quoted is the amount invoiced: no extras discovered at the end of the job.
Insured with AXA
Full professional liability coverage.
Transparent Pricing
Fixed quote in 2h. No hidden fees.
Fast Response
Teams available quickly in Geneva.
Our service area in Geneva
We provide fast and reliable services throughout the Geneva.
Frequently asked questions — Post-Construction Cleaning in Geneva
Why don't you quote a price per square metre for post-construction cleaning?
Because floor area does not determine the workload. Two identical spaces take one day or three depending on whether the residue is plaster dust or hardened cement haze, on the condition of the glazing, and on the presence of delicate surfaces. A rate per m² would have to be calibrated on the hardest case, so clean sites would pay a margin unrelated to them. We look at the site, then commit to a fixed figure.
What is cement haze and why does it resist cleaning?
It is a mineral film left by gauging water rising to the surface of the joints, whitening the tiling. It does not yield to household products because the problem is chemical rather than mechanical: it needs a descaler diluted to the substrate's porosity, a monitored dwell time, gentle mechanical work and then neutralisation. Scrubbing harder only scratches the tiling.
Do rubble and waste need removing before you arrive?
Not necessarily — we can take on the removal, but it is priced by volume rather than by area, like a clearance. The most efficient arrangement is removal and cleaning in sequence by the same team, because it prevents a fresh layer of dust settling on floors that have already been treated.
Are glazing and film removal included?
Yes for glazing reachable without a cherry picker, films and labels included. Height access requiring a cherry picker is quoted separately because it involves different equipment and insurance cover. Note that films left too long in the sun polymerise, and removal then becomes solvent work — considerably slower.
How long before handover should the cleaning happen?
As close as possible, and after the last trade. Every subsequent intervention puts dust back into suspension and it settles on treated surfaces. We ideally plan a short touch-up on the morning of handover for marks that have appeared in between.
Do you work weekends if the handover is postponed?
Yes, seven days a week. That is the reason for this arrangement: handovers rarely move by three weeks, they move by forty-eight hours, and a site handed over on a Monday morning is cleaned on the Sunday.
What is the difference between a rough clean and a handover clean?
The rough clean happens during the works: it clears circulation routes and makes surfaces workable for the next trade, without aiming at a finished result. The handover clean targets the condition in which the client takes possession, including the inside of cupboards and ventilation grilles. A good rough clean does not remove the need for the second, it makes it faster.
Do you treat delicate floors such as parquet or natural stone?
Yes, with distinct protocols. On freshly laid parquet, water is the main risk. On natural stone or marble, common acids are excluded and the treatment is slower. That is exactly why a witness-area test precedes any application, and why a quote given over the telephone remains an approximation.
Do you work on a partial site in an occupied dwelling?
Yes, and it is a substantial share of demand in Geneva: a bathroom redone, a kitchen replaced, a wall removed. The work differs because existing finishes have to be protected and dust contained rather than a bare volume treated, and because the occupier is living on site throughout.
What happens if a cleanliness reservation is raised at handover?
We return and put right, at no charge, the cleanliness items that fall within our scope, within the useful deadline. Our commitment deliberately stops there: we do not promise acceptance of the site, which also depends on installation, finishes and adjustments — that is, on other trades' work.
Do you clean the common areas used during the works?
Yes where the scope includes them, and it is often necessary: stairs, landings, lift and circulation accumulate construction dust and are examined at handover. On a phased programme we organise by level rather than by unit, so the same circulation is not cleaned twice.
Do you provide documentation for the handover file?
Yes, on request we issue a document describing the scope treated, the intervention date and the protocols applied to the floors. That is useful when the client has to compile an acceptance file or evidence the delivered condition to a third party.
Post-construction cleaning across the canton of Geneva
The Geneva market produces a particular pattern of demand: a great deal of heavy renovation in older central buildings, in the Old Town, Eaux-Vives or Plainpalais, where access governs the intervention as much as the works themselves. A narrow stairwell with no lift, no loading bay, a parking permit to be applied for — these constraints do not appear on a drawing and are paid for in hours if they were not surveyed beforehand.
In the outer communes — Carouge, Lancy, Meyrin, Vernier, Onex, Plan-les-Ouates — new build and roof extensions dominate, with programmes delivered in phases. The constraint there is different: several units to treat in one short window, often with a final trade still working in the stairwell. We then organise by level rather than by unit, which avoids cleaning the circulation twice.
Finally the Geneva calendar concentrates: handovers cluster before the summer holidays and at year end, and the ends of March, June and September concentrate move-ins. In those periods availability is the limiting factor rather than price. Booking as soon as the handover date is known, even provisionally, is the only reliable way to hold the slot you actually need.